BOEM-S a Tool to Measure the ISO 50001 Part III – Procedures

M&T_parte_03

Summary

Before the implementation of M&T measures some preparatory steps are needed as described below:

a) Identification of the major energy consumers in each sub-process. Usually, the primary energy consumption is due to a small number of devices or in processes or machines (Paretto rule). Usually, this step requires a site visit to survey the equipment and systems, and some measurements of the level of consumption of the various equipment.

b) During this step of the M&T program, it is necessary to define other process variables that can help to characterize it, such as production, temperatures and flow rates. Once the variables are defined and the necessary measuring equipment is installed the remaining steps of the M&T program can be initiated.

Written by Dr Jorge Antunes | 2014 | 6 pages

DOWNLOAD

Fill the form below and receive the whitepaper on your e-mail.


    In the context of GDPR, by completing this form to download this document you are agreeing to be contacted by TecnoVeritas. To know more consult our Privacy Policy.

    Leave a Reply

    Your email address will not be published. Required fields are marked *